Mossop Construction + Interiors

Playford International College

Refurbishment

Client: Minister for Transport and Infrastructure
Duration: 40 Weeks
Delivery: AS2124-1992 (Amended)
Value: $5.8m

The scope of works for this project comprised of multiple buildings, refurbishments and external work projects across the campus including:

  • a new entrance statement and improved pedestrian connections to the school reception.
  • new school reception and meeting rooms incorporating demolition of the existing stair.
  • a new Visual Arts Centre as a refurbishment of the existing Visual Arts classrooms.
  • upgrade of the existing stair and ground floor corridor including replacement of existing window and new door to improve access and amenity within the main school building.
  • upgrade of ground floor student toilet facilities. Upgrade of staff toilet facilities
  • upgrade of the Staff Room Kitchen facilities
  • a new Creative Arts Centre as an extension to the existing Special Interest Music Centre.
  • a new Physical Performance Training Centre and new teacher preparation areas incorporating an extension to the front of the existing Gymnasium.
  •  a new Hospitality Function Centre incorporating an extension to the existing Home Economics building and including refurbishment of the domestic student kitchens.
  •  a new Supported Learning Centre as a refurbishment of the existing ‘C Block’.

A major project challenge was the managing of multiple work zones; a total of 11, as well as ensuring sufficient trade resourcing and co-ordination.