
The project for Norwood Primary School is not based upon a template building; rather it is a purpose designed facility for the schools specific requirements with both the design and construction of the project controlled and executed by Mossop Construction + Interiors. The school has a significant arts focus (visual and performing arts) and required a dedicated facility to encourage student growth in this area.
The proposed works at Norwood Primary School involved the demolition of 3 existing buildings and construction of a new multi-purpose hall comprising of a entrance foyer, a 200 seat auditorium, storage /greenroom area, kitchenette/office area, and toilet facilities.
Mossop ‘s input in the design phase of this project meant that construct ability issues could be considered during the design phase allowing for a greater fluency for work during construction. This enabled the project team to devote more time to the quality of produce during the construction phase in lieu of attempting to resolve latent design issues.