• Hilton Hotel - The Collins Bar
    Completed In 23 weeks

    2013 Master Builders Association (SA) Building Excellence Awards

    Category: “Excellence in a Commercial Refurbishment/Redevelopment upto $5m”

    Award: WINNER

    Judge’s Comments: “The transformation of the old Charlie’s Bar into the Collins Bar was a complex and highly detailed project. The work had to be executed while the hotel continued to operate and site access in the CBD added further complication. The builder contributed to complex detailing solutions and had to deal with latent conditions in encountering asbestos. The end result was exemplary.”

    Client: Site Host Pty Ltd

    Design Consultant: Woods Bagot

    Refurbishment of existing bar including extensive stainless steel work to bar and back of house, detailed architectural finishes,  installation of opening windows, feature ceiling, and wet areas.  The Collins Bar features a table which is a piece of artwork to be admired. The table top was machined from a single piece of timber from the Raintree Species which originates in the Neotropics.  The particular tree from north Queensland was blown over during Cyclone Yasi.

  • Hilton Adelaide Level 1
    Completed in 19 weeks

    2004 Master Builders Building Excellence Awards
    Category: Excellence in a Commercial Fitout
    Award: Winner

    Client: Site Host Pty Ltd T/A Hilton Adelaide

    Supervising Consultant: Carr Design Group Pty Ltd

    Complete refurbishment of the Level 1 Function spaces consisting of the main Ballroom, meeting rooms, conference rooms, business centre, bar service area and foyers.

  • Hilton Adelaide Level 16 Executive Suites
    Completed in 8 weeks

    2001 Master Builders Association (SA) Building Excellence Award
    Category: Excellence in a Commercial/Industrial Fitout
    Award: Commendation

    Client: Site Host Pty Limited

    Supervising Consultant: Walter Brooke & Associates

    Construction of new presidential suite, executive lounge and 17 executive rooms and upgrade of corridors and lift lobby on Level 16.

  • Adelaide Festival Centre - Dunstan Playhouse
    Completed In 8 months

    Client: Department Transport, Energy & Infrastructure

    Design Consultant: Hassell

    Refurbishment to the main auditorium including replacement of fabric to all chairs, foyer upgrade and public spaces including service upgrades and asbestos removal.

  • Saltram Winery
    Completed in 7 months

    Client: Beringer Blass Winery Estate

    Supervising Consultant: Angus + Dowie Architecture

    The complete refurbishment of the existing cellar door sales area and function spaces plus extension of the existing building for expanded restaurant including construction of new commercial restaurant, produce and teaching kitchen, coolroom and freezers, back of house offices, new vegetable and herb gardens, new site amenities and new siteworks including new carparking, entry and gardens. The kitchen spaces were designed and constructed in close consultation between the restaurateur (head chef), architect, engineers and Mossop’s project team to achieve the desired operating functionality, budget and appearance required. Both cellar door sales and the restaurant remained in full operation during construction.

  • Flinders Refectory
    Completed in 6 months

    Client: Flinders University

    Design Consultant: Tridente Architects

    This project involved the partial demolition of the existing building on Levels 0 and 1 of the Flinders University Union Building; the refurbishment of the University Refectory and associated function areas on Level 1 - including new food preparation and service areas, Coopers Bar and multi-purpose student space; as well as the refurbishment of service areas on Level 0 and all associated building services. Particular attention was required to ensure that all work in the kitchen and Coopers Bar food service areas conformed to AS 4674.

     