• 101 Pirie Street Base Building Refurbishment and Dental Fitout
    Completed in 30 weeks

    This Managing Contractor project - comprising 3 stages - involved base building refurbishment of 8 floors (ground - 7th), and commercial fitout of the new home for Health Partners in SA, (level 1). Part A: Base building refurbishment to the ground floor entrance and lift lobby, including a complete reception upgrade, feature ceilings and stone walling; upgrade of the ground floor canopy; base building refurbishment of level 1; and the upgrade of lift cars. Part B: Dental clinic fitout on level 1 consisting of 20 new dental surgeries, sterilisation areas, high end reception joinery installation and client waiting areas. Part C: Base building upgrade to all other floors, including new toilet cores across all floors, base building infrastructure replacement; and upgrade to the external fa├žade. Following successful completion, we have secured an additional $5m of executive suite and optical fitouts with Health Partners.
  • Marion GP Plus
    Completed in 12 weeks

    Client: Department for Transport, Energy & Infrastructure

    Design Consultant: Thinc Projects

    This project involved the procurement, supply, installation, commissioning and training for furniture and equipment for a new GP Plus Clinic, incorporating both office and clinical facilities, at the Marion Domain site. The project also included construction of a roof top garden base with a waterproof membrane and paving.

     

     

  • COMIC Foundation Family Space Upgrade
    Completed in 2.5 weeks

    Client: COMIC Foundation Australia Ltd

    Architects: Studio Tonic

    This project involved a general interior and furniture upgrade with some external changes for the COMIC Foundation Family Space at Lyell McEwin Hospital. The project brief was to provide a happy and fun environment for the children of mental health patients during their stay. It involved a multi-functional indoor area for playing, studying, gaming and being together, as well as a new cubby house outside. The project was delivered as cost efficient as possible with a number of suppliers and subcontractors providing time and product at a reduced cost or for free to assist in the delivery of this project for a not for profit foundation.

Found 3 Results, displaying 1 to 3