• 101 Pirie Street Base Building Refurbishment and Dental Fitout
    Completed in 30 weeks

    This Managing Contractor project - comprising 3 stages - involved base building refurbishment of 8 floors (ground - 7th), and commercial fitout of the new home for Health Partners in SA, (level 1). Part A: Base building refurbishment to the ground floor entrance and lift lobby, including a complete reception upgrade, feature ceilings and stone walling; upgrade of the ground floor canopy; base building refurbishment of level 1; and the upgrade of lift cars. Part B: Dental clinic fitout on level 1 consisting of 20 new dental surgeries, sterilisation areas, high end reception joinery installation and client waiting areas. Part C: Base building upgrade to all other floors, including new toilet cores across all floors, base building infrastructure replacement; and upgrade to the external façade. Following successful completion, we have secured an additional $5m of executive suite and optical fitouts with Health Partners.

  • Department of Immigration and Border Protection (DIBP) Adelaide Office Fitout
    Completed in 12 weeks

    This project involved the fitout of 6,000m2 of office tenancy accommodation in the Adelaide CBD for the DIBP, to accommodate the relocation of approx. 420 staff. The fitout of five floors (levels 1-5) and a part ground floor consisted of flexible open plan workstation areas, quiet rooms, meeting spaces, kitchen/breakout facilities, equipment/utility areas, IT and server rooms. The Department’s design scope was further expanded to include: secure interview/ holding room facilities; client contact areas, such as counter and waiting areas; secure mail handling facilities; other purpose designed facilities to assist staff to meet work-life balance, such as carers’ rooms, prayer rooms, as required; and basement storage facilities for surplus furniture and equipment.
  • Old Parliament House

    Old Parliament House was constructed in 1843 and over time has seen at least 28 separate additions or improvements. The building is of major historical significance both at the state and national level with Old Parliament House the only building in South Australia on the national heritage register.

    Faced with an ageing and progressively dysfunctional facility, The Department of Planning, Transport and Infrastructure engaged Mossop Construction + Interiors in the role of Managing  contractor under a collaborative form of contract to work with the project team. The project was to redevelop and upgrade the building in a manner that is sensitive to the heritage and historical context of the building and to provide a wholly 21st century functional (both use and infrastructure) and fully accessible (disability access compliant) building to meet long term requirements of the state and ensure ongoing maintenance of a significant piece of the state’s building history.

    Delivered on and adjacent the secure, operational and prominent North Terrace Parliament House site the conservation and redevelopment project was quietly and sensitively delivered to achieve the client desired outcomes.

  • Bank SA Mt Gambier
    Completed in 8 weeks

    Client: Bank SA - A Division of Westpac Banking Corporation

    Supervising Consultant: Hodgkison Architects

    Complete refurbishment of the existing Bank SA Finance office to turn it into the BankSA Mt Gambier branch. Including new toilets, shop front, re-levelling of existing floor, new airconditioning and furniture and fittings.

  • Hindmarsh Building 3 - Boral Head Office
    Completed in 11 weeks

    Client: Kateena Holdings

    Supervising Consultant: Hardy Milazzo

    The new fitout of 1800 square meters office space spread over three floors in a new 5 star Green Star Building. Significant savings achieved against original tender without compromising the quality of finish to achieve client’s budgetary constraints. Project completed on time for client to occupy by drop dead date for relocation from premises.

     

     

  • Stylecraft Adelaide
    Completed in 7 weeks

    Client: Stylecraft

    Design Consultant: Woods Bagot

    Fitotut of the new Adelaide Stylecraft showroom and offices inclusive of back of house area, displays, internal finishes and services.
  • Hills Holdings Limited
    Completed in 14 weeks

    2012 Master Builders Association (SA) Building Excellence Awards
    Category: Excellence in a Commercial Fitout
    Award: Commendation

    Client: Haddon Heights Pty Ltd

    Supervising Consultant: JPE Design Studio

    Luxury office fitout of existing Green Star Building. 3,000 square metres over three floors. State of the art communications equipment and stunning feature staircase. Project completed on time and under budget. The fitout was delivered as part of an integrated build with the base building.

     

     

     

  • Australia Post - Rundle Mall
    Completed in 6 weeks

    Client: Australia Post Corporation

    Architect: Swanbury Penglase

    Complete staged tenancy refurbishment of an existing operational Australia Post retail outlet including new partitions, ceilings, floor coverings and joinery.

  • CBA - Arndale, Kilkenny
    Completed in 5 Weeks

    Client: Commonwealth Bank of Australia

    Architects: Hodgkison Architects

    A complete fitout of a new tenancy at the Centro Arndale Shopping Centre for Commonwealth Bank which included the new design after hours ATM lobby with ACM wall claddings,  3 sales offices, 4 screened tellers, Staff Amenities area and Back of House ATM Room and work areas. Secure area partitions have been constructed to CBA security standards and installation includes advanced security and CCTV installations.

  • Hunt & Hunt
    Completed In 12 Weeks

    Client: Hunt & Hunt Lawyers

    Supervising Consultant: Hassell

    The design and construction of 2200m² of new commercial office fitout consisting of 52 offices, 28 workstations 7 meeting rooms, 12 auxiliary rooms/areas, centralized staff breakout hub and associated spaces. Project included operable wall and associate structure, floor coverings and all systems and loose furniture.

     

  • Clemenger BBDO Fitout
    Completed in 10 weeks

    2008 Master Builders Association Building Excellence Awards
    Category: Excellence In Commercial Fitout
    Award: Commendation

    Client: Clemenger BBDO

    Supervising Consultant: Woodhead

    Fitout within a heritage building of a new modern open office of 860 square metres.

     

     

     

     

  • AECOM Adelaide Office Fitout
    Completed in 11 weeks

    2008 Master Builders Association Building Excellence Awards
    Category: Excellence In Commercial Fitout
    Award: Commendation

    Client: AECOM

    Supervising Consultant: Blight Voller Nield

    This was a 5 star green star rated interior fitout of two floors.


     

  • State Electoral Office
    Completed in 12 weeks

    Client: Department of Transport Energy & Infrastructure Building Management

    Design Consultant: JPE Design Studio

    Fitout of level 60 light square for new accommodation for the state electoral office.

  • LMC Fitout
    Completed 20 weeks

    Client: Land Management Corporation

    Design Consultant: Woodhead

    Fitout of new workspace for the Land Management Corporation (LMC), following refurbishment of the base building - a full refurbishment, with retention of existing ceiling grid and some services, including all new floor finishes, partitions, joinery, FFE, ceiling tiles, a significant graphics package and specialised ceilings. Features include an expansive, partially enclosed balcony for use in all weather conditions. LMC have a strong commitment to sustainability, and as such the interior fitout sought formal recognition, achieving a 5 star Green Star-Office Interiors v1.1 rating, utilising elements such as integrated photovoltaic panels on the façade glazing.

  • Orlando Office Fitout
    Completed in 12 weeks

    Client: Pernod Richard Pacific

    Design Consultant: Materne Pennino Hoare

    Office fitout of two floors with interconnecting staircase and facilities to reflect their international business position in the wine industry.

  • Safework SA
    Completed in 13 weeks

    Client: Department for Planning, Transport & Infrasstructure

    Design Consultant: Hassell

    Fitout of new 4,375m2 office, incorporating meeting rooms, executive offices, boardroom and staff facilities. Works were completed concurrently as the base building was being completed by others. Site access was restricted and all material, products and equipment was delivered via external crane access only. Features of the project include introduction of new circulation stair from level 4 to 5, high level acoustic treatments to all partitions, and fast tracked construction program without compromising quality or integrity of the work.

  • Industry House
    Completed in 10 months

    Client: Wine Australia

    Architects: Studio Tonic

    This project involved the revitalisation of Wine Australia’s offices in Industry House at the iconic National Wine Centre in Adelaide. The interior includes meeting and conference rooms, breakout areas, ‘quiet rooms’ and open plan offices. 

  • 45 Pirie Street
    Completed in 23 months

    Client: Colonial First State Global Asset Msanagement

    Supervising Consultant: Coffey Projects

    Mossop Construction + Interiors undertook the refurbishment of base building toilets over 13 levels; base building lift foyers upgrades over 17 levels, lift cart upgrade to all 6 lifts; upgrade of base building services and complete new refurbishment of the ground floor foyer entrance, back of house and plaza forecourt at 45 Pirie Street. Works were completed in 38 stages over 18 levels of the building whiles the building tenants remained in full occupation.

     

  • Hindmarsh Building 1- Mossop Construction + Interiors
    Completed in 17 months

    Client: Haddon Heights Pty Ltd

    Supervising Consultant: Hardy Milazzo

    Design and construction of an extension, alteration and interior fitout in a 2,620m² office building including the refurbishment of the State Heritage registered Brompton Methodist Church originally constructed in 1875. This refurbishment included the repairs to the ceilings and walls internally and stone work externally while providing an alternative entry to the Heritage building in sympathy with its original construction. Heritage ID No: 11805, including the construction of a 2 level, 84 space carparl for the building.

  • DMG Radio
    Completed in 26 weeks

    2005 Master Builders Association (SA) Building Excellence Awards
    Category: Excellence in a Commercial Fitout
    Award: Winner
     

    Client: DMG Radio Adelaide

    Design Consultant: Graham Nicholls Pty Ltd

    Fitout of 3 floors incorporating 8 sound studios, corporate office fitout and general office fitout.

  • Housing Industry Association
    Completed in 21 weeks

    Client: Husing Industry Association

    Design Consultant: Smith Maddern Architects

    Fitout of a 2 level building incorporating a new lift, new external cladding and redevelopment of the existing car par in an occupied building.

     

  • AFP - Jupiter Stage 3 - Adelaide Airport
    Completed in 24 weeks

    Client: ASustralian Federal Police

    Design Consultant: Group GSA

    Fitout of a 3 storey, 2300m2 secure facility at Adelaide Airport for the AFP. Works included integration with the base building contractor, gymnasium, an Emergency Operations Centre, Airport Police Operations Command, muster rooms and training facilities, exhibit handling facilities, interview rooms, holding rooms,  a secure undercroft carpark, office spaces, and building services  to 4.5 NABERS Rating/4 Green Star Rating.

  • Statewide House - MAC
    Completed in 6 months

    Client: Motor Accident Commission

    Architect: TECTVS

    Refurbishment and upgrade of the ground floor entry foyer and lift lobby including a new canopy to the front of the building and heat deflection screening extending to level 3 above. The works comprised services upgrade, new floor tiling and ceilings, L.E.D back-lit feature glass wall, relocated entry and new open area interface between the foyer and adjoining café/coffee shop. The building was in full occupancy during the works.