• Calvary Central District Hospital Cancer Care & Specialist Rooms
    Current

    Client: Calvary Central Distrcits Hospital

    Design Consultant: IA Group

    The Design and Construction of a new cancer treatment centre including specialist consulting and treatment suites (Radiotherapy Centre, Pharmacy, Clinpath Pathology and Cardiology Consulting) at Central Districts Hospital. Project includes working in and adjacent an operational hospital facility and the construction of 2 radiotherapy bunker treatment rooms. The specialist construction of the radiotherapy bunkers in situ 600mm thick concrete floor and roof structure with further in situ continuous concrete poured walls which on average is 1m thick was required to ensure no formed joints for escape of the radiation for the treatment equipment.

  • Norwood School Performing Arts Centre
    Completed in 9 months

    2011 Master Builders Association (SA) Building Excellence Awards
    Category: Excellence in a Commercial Building $1m - $2m
    Award: Winner
     

    Client: Education Department

    Architect: Swanbury Penglase

    Demolition of 3 existing buildings and construction of a new multi-purpose hall, comprising of entrance foyer, 200 seat auditorium, storage/greenrooom area, kitchennette/office area and toilet facilities.

  • East Adelaide School Hall
    Completed in 8 months

    Client: Department for Education & Child Development

    Architect: Flightpath Architects

    Design and construct of new multipurpose hall and refurbishment of existing building. Both projects ran concurrently with the refurbishment of the existing GLA being handed over 3 weeks early.

  • Ethelton Apartments
    Completed in 13 months

    Client: Portway Housing Association

    Architect: Swanbury Penglase

    Land division of the old Ethelton Primary School into 21 residential allotments, 1 multi-dwelling allotment for 12 units and the conversion of two Heritage Primary School buildings into 10 apartments.

  • Smith Motors Port Lincoln
    Completed in 7 months

    Client: Smith Motor Company

    Architect: Arco Architecture

    Construction of new dealership building incorporating showroom and mechanical workshop.

  • Dan Murphy's/Cafe Primo Munno Para
    Completed in 5 months

    Client: Chapley Nominees

    Architect: Hardy Milazzo

    Design and construction of a new 2,000 square metre tilt-up building.

  • Hindmarsh Building 2 - Hills Holdings Ltd
    Completed in 16 months

    Client: Haddon Heights Pty Ltd

    Architect: JPE Design Studiio

    Construction of a 3 storey State of the Art, 5 Star Greenstar rated office building witha a gross floor area of 4710m² and the construction of a 2 level, 167 space car park. Construction duration, including fitout 70 weeks.

  • Hindmarsh Building 3 - Boral Building
    Completed in 12 months

    2012 Master Builder Association(SA) Excellence Awards
    Category: Excellence in a Commercial / Industrial Building $5m to $10m
    Award: Commendation

    Client: Kateena Holdings

    Architect: Hardy Milazzo

    Construction of a 3 storey, State of the Art, 5 Star Green Star rate office building with post tensioned floor slabs to reduce the requirements of columns within a gross floor area of 2100m² including the construction of a 2 level, 70 space car park. This building was built on a tight site between an operating Library and State Heritage Church.

  • Hindmarsh Library
    Completed in 6 months

    Client: City of Charles Sturt

    Architects: Hardy Milazzo

    Design and construction of an innovative 600 square metre facility incorporating a library and fitout of the building.

     

     

Found 9 Results, displaying 1 to 9